Hot Selling LED 2016 New 10 - 100W COB LED Downlight with IP54 / 5 Year Warranty /Ce&RoHS

US$15.00 - 132.00 1 Piece (MOQ)
Port:
Shenzhen, China
Production Capacity:
50000 Set / Month
Payment Terms:
T/T, Western Union, Paypal

Last Login Date:

Jul 26, 2022

Business Type:

Manufacturer/Factory

Main Products:

High Power LED, LED Flood Light, LED High Bay, LED Strip Light, LED Tunnel Light, Power LED, LED Recessed Down Light, RGB LED Flood Light, LED Wall Pack, LED Billboard Light

Find Similar Products

Product Description

Company Info

Basic Info.

Model NO.
LS-RS15-100
Beam Angle
20,40,60 Degree
Input Voltage
90-295V AC
Power
15-100 Watt
Color Temperature
2800-7500k
Lamp Body Material
Metal+PC Housing
Source Number
Single Plug
Installation
Lamp Installation
Plug Lamp
Warranty
5 Years
Application
Engineering, Home Furnishing, Mall, Hotel, Metro etc, Dry Indoor
IP Rating
Certification
CE, GS, RoHS
Light Efficiency
120 Lm/Watt
Model No.
Ls-Rsl15-100
Ambient Temperature
-20 ~ 45
Ambient Humidity
10%~90%R.H
Housingtemperature
<60 Degree
Lifespan
>80000 H
Power Facto
>0.9
Color Render Index
>80
Trademark
Ledsmaster
Transport Package
Wooden Carton Box
Specification
10-25 kg, depending on lamp size
Origin
China
HS Code
9405409000

Product Description

Hot selling LED 2016 new 10 - 100W COB LED downlight with IP54 / 5 year warranty /CE&RoHS

2-10 times brighter than conventional light    
3rd Generation Direct Heat Path Technology, 2-5 times better stability
Anti-Glare System, suitable for any occasions    
IP54, underwater use support
5 Years Warranty! 

Model No.Power
(watt)
Light efficiency
(lm/watt)
Lumen 
(White)
Available 
Angle
Direct Replacement MHColor
 Temperature
Light Size
(inch)
Working
Voltage
LS-RSL1515120180020,40,60
degree
30W2800-3500K
5000-6000K
6500-7500K
3.5110/220V AC
LS-RSL2727324050W4
LS-RSL3737444070W5
LS-RSL4040480080W590-295V AC
LS-RSL50506000100W6
LS-RSL60607200120W8
LS-RSL70708400140W8
LS-RSL80809600160W8
LS-RSL10010012000200W8

Installation:

Please pay more attention to the below instructions while installation, in order to avoid any possible Fire
Hazard, Electric Shock or Personal harm.
Instructions :
1. Cut off Electricity before installation.
2. The product only used in DRY environment
3. Please do not block any objects on the lamp (distance scale within 70mm), which will definitely affect
heat emission while lamp's working
4. Please double check before getting electricity on if wiring is100% OK, make sure Voltage for lamp is right
and no Short-Circuit.

Wiring:

The Lamp can be directly connected to City Electric Supply and there'll be detailed User's Manual and
Wiring Diagram.

Warning

1. The Lamp is only for Indoor and Dry application, keep away from Heat, Steam, Wet, Oil, Corrosion etc,
which may affect its permance and shorten the lifespan.
2. Please strictly follow the instructions while installation to avoid any Hazard or damages.
3. Any installation, check or maintenance should be done by professional, please do not DIY if without
enough related knowledge.
4. For better and long performance, please clean the lamp at least every half year with soft cloth. (Do not
use Alcohol or Thinner as cleaner which may damage the lamp surface)
5. Do not expose the lamp under strong sunshine, heat sources or other high-temperature places, and
storage boxes cannot be piled up exceeding the requirements.


              

Ledsmaster Downlight Application




Logistics

Company Information

Ledsmaster full experience in downlight, outdoor light ,such as led street light,IP67 led high bay,billboard light,tracking light,led wall apck,led strip light,RGB led flood light and led flood light, highly experienced in sports lighting, for venues big and small - so whether it's a local golf club, a racecourse or an international stadium, we've got the breadth and depth of experience to provide the right solutions.

FAQ

Q1: What's your delivery time for the new design led downlight sample and batch order?
A1: Your sample can be ready within one 3-7 working days.
For the batch order, the delivery time is around 7-20 working days.

Q2: What's your payment term?
A2: The payment term is 30% by T/T, the balance before shipment.

Q3: Do you have MOQ(Minimum Order Quantity) for the order?
A3: There is no limit for the quantity. Any quantity is available.

Q4:Can we do customized packing for new design led downlight?
A4: Yes, the packing can be made according to your requirements.

Send your message to this supplier
Mr. Beatus

Post a Sourcing Request Now

People who liked this also liked